Kawasaki 'Leasion' Kit

$199.99
Bike Size: KX450F 2019, 2020
MATERIALS
OUR PRINT MEDIA
6.0mil Ultra-Aggressive Print Media w/FLO Technology

Ultracurve X1 is a revolutionary print film with FLO Technology, allowing for bubble-free application of graphics to motocross bikes, ATVs, karts, and other extreme applications.


Developed alongside Team Monster Energy Kawasaki in the USA, Ultracurve X1 dramatically reduces installation times and eliminates bubbles. If you aren’t using X1, your competition will be.

OUR LAMINATE
15.0mil Premium Clear Overlaminate

Specifically engineered for motocross, ATVs, snowmobiles, side-x-sides, helmets, and other extreme applications requiring exceptional protection, durability, and flexibility.


Combined with X1, Ultracurve 1500 is the market leader in motocross technology, trusted by the World’s fastest professional and amateur motocross riders.

THIS KIT INCLUDES
FULL GRAPHIC KIT INCLUDES
  • RADIATOR SHROUD SET
  • FRONT AND SIDE NUMBER BOARDS
  • AIR BOX DECALS
  • FRONT FENDER DECAL
  • REAR FENDER DECAL
  • FORK GUARD DECALS
  • SWING ARM DECALS
LOGOS
  • We have the majority of Motocross related logos, we cannot however add any energy drink logos to your graphics.
  • If you would like to use personal logos you can email them to sales@rivalink.com.au with your order number and name in the subject line (after order placement).
  • Logos will need to be in Vector format (AI, EPS, PDF). If you do not have one of these formats we can do our best to work with your file, or write the company name in a good looking font.
PRODUCTION
  • Most orders ship out within 7-10 business days of your order date. Adding Plastics / Fitment / Seat Covers to your order will increase the time for your order to be shipped.
  • Please allow 1-5 business days for print/cut production after your design approval.
WORLD CLASS DESIGNS

Our designs are hands down the best on the planet. Each canopy is designed from scratch with your needs in mind.

WE WASTE NO TIME

Once your designs are approved, your materials move into the production process. This takes four days, then it's out the door.

PRICE GUARUNTEE

We know that our materials are the best priced out there. If you can find something cheaper and comparible, we may price match.